
GROUNDFORCE SHORCO DELIVERS SUPPORT FOR SECOND TIDEWAY ATU
24/07/2023 A complex shoring solution supplied by Groundforce Shorco for another Tideway excavation. Groundforce Shorco has provided specialist equipment to support a second Air Treatment Unit (ATU) excavation on the Thames Tideway Tunnel, London’s Super Sewer project. The project requires a number of ATUs to be installed along the route of the 25km tunnel, to